Introduction to Subsea Pipe Installation- Pipelay Methods Installation

Overview of Deep Water Pipe Installation Methodology

Each method typically involves three key phases: the initiation phase, where a wire rope attached to a seabed anchor begins the process; the normal phase, covering most of the pipe's length; and the lay down phase, which finalizes the installation with a structure or pipe head cover. For deep water installations, deploying a pipe catenary from a lay vessel is often preferred. This method requires applying sufficient tension at the top to prevent buckling due to bending and external pressure, which increases as the pipe descends. Vessel motion from waves, wind, and currents also impacts the pipe catenary, along with factors like the pipe’s outer diameter, wall thickness, and coating. These elements, along with whether the pipe is installed empty or flooded, determine the optimal installation approach, which varies based on the pipe's size, depth, and purpose.