Introduction to Subsea Pipe Installation

  • Author: Technical Toolboxes
  • Level: Beginner 
  • Study time: 1 hour
Write your awesome label here.
What are the basics of subsea pipeline installations? What are the key pipelay methods like S-Lay, J-Lay, and Reel-Lay? How has the history and development of subsea fields influenced pipeline operations?

This beginner-level self-paced course introduces learners to the fundamentals of subsea pipeline installations, tailored for pipeline engineers, managers, and directors entering the field of midstream operations.

By the end of the course, participants will have a foundational understanding of the history and development of subsea fields and the basics of pipe installation.

The course covers essential pipelay methods such as S-Lay, J-Lay, and Reel-Lay, along with an overview of the structures and equipment involved. This course equips learners with the basic knowledge needed to begin navigating the complexities of subsea pipeline operations.
  • Video time: 1 hour
  • Exams: 1

Table of Contents

Write your awesome label here.
  • Chapters:
    Brief history of subsea fields 

    • Quick facts about subsea pipe installation
    • Importance of subsea pipeline installation
    • The evolution of subsea oil fields
    • Difference between shallow water and deep water
    • Different types of offshore platforms
    • Understanding deepwater oil fields

    History of pipeline installation
    • Operation PLUTO
    • The Evolution of offshore pipeline installation
    • Innovation in the oil industry

    Pipelay methods 
    • Introduction to pipelay methodology process
    • Most common methods of offshore pipe installation
    • S-lay method
    • J-lay method
    • Reel lay method
    • Reel lay installation equipment
    • Summary of pipelay method
    • Pipelay methodology selection overview

    Pipe structures
    • Course references and closing

Bernardo Huesca

Subsea Installation Engineer, SME
ABOUT Bernardo
Bernardo Huesca is a seasoned professional with 12 years of experience in the field, currently serving as a Lead Installation Analysis Engineer at Subsea 7. ​
Bernardo holds a Bachelor’s degree in Naval Architecture and a Master’s degree in Ship and Offshore Structures. His work at Subsea 7 over the past 11 years has involved installing rigid pipe, flexible pipe, umbilicals, and structures for esteemed clients such as BP, Shell, Murphy, Oxy, and LLOG. ​
His significant projects include Mad Dog II, King’s Quay, Coulomb, Atlantis, Dalmatian, Salamanca, Katmai, Heidelberg, and Stampede. ​
These experiences have equipped him with a deep understanding of the industry and a proven track record of success.