Tim Arnold and Luke Jain

Introduction to RIN2- Subpart I: Enhanced Corrosion Control Measures

Subpart I: Requirement for Corrosion Control

This section explores the Subpart I requirements for corrosion control under the RIN 2 pipeline regulations. Key updates include new criteria for external corrosion control, particularly in sections 461 and 473, focusing on remediation timelines and addressing AC/DC interference. The session also introduces a new section on internal corrosion control, detailing the criteria for monitoring and mitigating corrosive conditions inside pipelines. Additionally, the transcript references compliance with section 712 for remedial measures, essential for ensuring pipeline integrity.
Write your awesome label here.